Fields/Athletic Facilities
Provide synthetic turf and improvements to the Baseball and Softball fields. Place refurbished bleachers at Baseball and Softball fields. Resurface the Cardon Field track and replace the long jump and pole vault runways. Resurface the tennis courts and place refurbished bleachers. Replace the gravel area with grass and sidewalk access. Construct a new indoor practice facility.
At Doc Harris Stadium, increase the movable bleacher seating and improve safety by providing stair access. Add power and improve the sound system.
At Skyridge Middle School, replace the two long jump runways and restripe the track.
Budget | $5,000,000 |
Funding Source | 2016 Bond |
Project Status | Design |
Architect | Robertson Engineering |
Contractor | Various |
Estimated Start | Various: Spring 2018, 2019, 2020 |
Estimated Completion | Various: Fall 2018 & 2019, Winter 2020 |